Skip to main content

Projects and Checklists

Use Projects and Checklists to break larger work into manageable steps. Each step inside them is a subtask. The key difference is scheduling: project subtasks can each have their own dates and alerts, while checklist items share their parent checklist’s schedule.

Screenshot coming soon

A project with independently dated subtasks displayed alongside a checklist of packing items.

Choosing Between a Task, Project, and Checklist​

TypeBest forScheduling behaviorFocus List behavior
TaskA single standalone action.Carries its own dates, alerts, tags, and action.Appears as one item.
ProjectMulti-step goals where steps happen on different days (such as Refresh the kitchen or Prepare conference talk).Each subtask can have its own start date, due date, alerts, and tags.Subtasks appear individually in Today, All, and Starred when they qualify.
ChecklistSimple sequences that only matter together (such as Packing list or Pre-flight steps).Items inherit their schedule from the parent checklist and do not carry separate dates.Appears as a single item in Focus Lists so individual steps don’t clutter Today.
tip

Start with a regular task whenever an idea is small. When it grows, add a subtask or drop other tasks onto it to turn it into a project automatically, or convert it to a checklist if the steps share one schedule.

Creating a Project or Checklist​

  1. Right-click a task row, open New, choose Project or Checklist, and enter a name.
  2. Select the parent, right-click, and choose New > Sub-Task to add steps inside it.
  3. Click the disclosure arrow beside the parent (or press C with the parent selected) to expand or collapse its subtasks.

To bundle existing tasks together, select their rows, right-click, and choose New > Project from Selection or Checklist from Selection. You can also drag selected tasks onto an existing project or checklist in the left panel, or drop tasks onto a regular top-level task to convert it into a project.

Project View and Per-Project Sorting​

  • Open Project View: Right-click a project and choose Open Project View to focus exclusively on that project and its subtasks without the rest of the list in sight.
  • Sort independently: Right-click a project or checklist and choose Sort Project or Sort Checklist to give that container its own sort order (by date, priority, or manually) without changing how the surrounding list is sorted.

Screenshot coming soon

A project opened in Project View with its own sort order and subtasks expanded.

One Level of Subtasks and Converting Types​

2Do supports one level of subtasks so plans stay flat and easy to scan:

  • Moving a project inside another project flattens it, turning its title and children into sibling subtasks of the destination project.
  • Converting a project or checklist back into a regular task releases its subtasks into the main list.
  • Converting a project into a checklist keeps the subtasks inside, and they inherit the checklist’s schedule from then on.

Check the resulting order after converting or moving containers, or press Ctrl+Z to undo in one step.

tip

Checklists make great reusable templates: select a checklist and press Ctrl+D to duplicate it whenever you need a fresh copy for the next trip or routine.